GEO PROVIDES YOU WITH A COST EFFECTIVE
SOLUTION AT
OUR DATA FACILITIES AND CITY LOCATIONS
Hypothetical Net Cost
Saving Using
Turnkey Design/Build
Approach VS Traditional Approach
| |
COMPETITION
|
GEO |
| |
Architect/Engineer, Construction
Manager, General Contractor Approach |
Traditional Build Approach
"Turnkey" Design/Build |
| Site Study Requirements Analysis |
$15,000 |
$ Included |
| Preliminary Site Plan/Space
Plan |
$25,000 |
$ Included |
| Detailed Engineering Plans,
Specifications and Bid Documents |
$250,000 |
$250,000 |
| Architectural and Engineering
Supervision During the Construction Phase |
$250,000 |
$ Included |
| Total Cost Architectural/Engineering |
$540,000 |
$250,000 |
| Sub-Contractors Bid (Alt #1) |
$19,200,000 |
$ Included |
Construction Managers Fee
5% & 7% of Construction Bid (Alt #1) |
$2,304,000 |
$4,900,000 |
| SUBTOTAL
(ALT#1) |
$22,044,000 |
$ Included |
| OR |
|
|
| General Contractors Bid Price
(Alt #2) |
$21,000,000 |
|
| Construction "Turnkey"
Bid Price Includes $ 250,000 A&E and Supervision. |
|
$18,450,000 |
| |
Total Cost
(Alt #1) |
Total Cost "Turnkey"
Design/Build |
TOTAL
NET
"TURNKEY"
SAVINGS |
| Architect/Engineer Construction
Mgr. Trade Subcontractors |
$22,040,000 |
$18,450,000 |
$3,594,00 |
| |
Total Cost
(Alt #2) |
Total Cost
"Turnkey" Design/Build |
TOTAL NET
"TURNKEY"
SAVINGS |
| Architect/Engineer General
Contractor |
$21,000,000 |
$18,450,000 |
$2,550,000 |
- GEO is able to provide this type
of project cost savings because all of the services
are provided by our in house staff.
- GEO arranges the pricing of our services
so customers may take advantage of the economies of scale
associated with your project much the same way a volume
discounts works.
- GEO gives you the option to change to
a design/build pricing structure at any stage
of the project.
|
|
TOTAL COST SAVINGS SUMMARY
|
| |
Cost
|
|
| |
COMPETITION |
GEO
|
GEO SAVINGS
|
SAVINGS
|
TOTAL GEO SAVINGS
|
| Leasing Cost/(Savings) |
|
|
|
Year 1 |
Year 2-15 |
Year 1-15 |
| Total Lease Cost Reduction |
1,467,200 |
1,246,000 |
221,200 |
221,200 |
3,096,800 |
3,318,000 |
| Installation And Operation Cost/(Savings) |
|
| Total Installation And Operation Savings |
25,544,00 |
16,630,000 |
8,914,000 |
8,914,000 |
5,880,000 |
14,794,000 |
| Total cost/(savings) |
27,011,200 |
17,876,000 |
9,135,200 |
9,135,200 |
8.976,800 |
18,112,000 |
|
 |